We design and manufacture solutions from the compressor to gas transportation.
With over 30 years of experience, we manufacture 90% of the components in our gas compression packages. This enables us to design solutions in a range from 60 to 2000 hp and deliver them within 120 to 150 days. Always with the confidence that their commissioning will ensure operational availability exceeding 99%.